1 plan, from product brief to published pages
First 24 hours: we sort your request into a project site, landing page, or addition to an existing site. Then we map the pages, inputs and checks before design begins.
| What | Count or window | What you send |
|---|---|---|
| Site format | 1 project site or campaign page | Product stage and audience |
| Main route | 1 primary visitor action | The action you want visitors to take |
| Page structure | Agreed page list | Product details and current links |
| Build checks | 1 list for agreed pages | Forms, links and required interactions |
Use a project site when visitors need separate routes to product details, documentation and contact. Use a landing page when one campaign or action leads the story. An existing site can stay in place while we build a new campaign page.
We turn those inputs into a page map and a list of items the build does not include. If the request goes beyond a marketing site, compare it with our Web3 development services or dApp development.
What happens before the first page is built?
5 decisions take the work from a product request to an approved design. Each step confirms what comes next. Open questions surface before they become late changes.
- Set the visitor action: name the single primary action for each page.
- Map the pages: separate product, use-case, documentation and contact needs.
- Check the inputs: gather copy, visual assets, links and approved product facts.
- Review the layout: confirm the page structure and design before development.
- Set the checks: list the pages, links, forms and responsive states to test.
A project with on-chain features needs a separate technical conversation. Share the intended user flow and existing product documentation. We can determine whether it belongs in the site or in smart contract development.
Your side moves fastest with one decision-maker and consolidated feedback. Before step 1, collect the current product description and target audience. Also gather brand files and the person who approves public claims.
Page content, search structure and build checks
A useful Web3 site gives each page a clear job. It also gives visitors a visible next step. Search-ready structure starts with distinct pages, readable headings and key information presented as text.
We plan content and page structure together. This keeps key details out of images. It also avoids unexplained protocol terms. Bring a source or owner for claims about product features, audits, integrations, roadmap and token utility.
The build plan can include:
- Page titles and headings that reflect each page’s subject.
- Readable URLs and direct navigation to product information.
- Responsive layouts that keep core actions visible on smaller screens.
- Supplied text and approved product details placed on the agreed pages.
- Specified forms, links and integrations, listed before development.
- A check log covering agreed pages and visible interactions.
6 content and structure checks help clarify what each page must do. If the marketing site supports on-chain features, keep its role clear. See token creation and deployment for a connected token project. For each page, decide what a visitor must understand before reaching the primary action.
Which Web3 page format fits the job?
A project site gives separate topics their own pages. A landing page keeps one campaign or action in focus. Choose the format by the number of distinct visitor needs, not by how large the project sounds.
A landing page can suit one launch, waitlist, application or single product action. A project site fits when visitors need separate explanations. Existing sites may only need an added page.
- Campaign page: focus on a launch, waitlist, application or single product action.
- Project site: separate product details, use cases and documentation.
- Existing site: add a page when its current structure serves the project’s other needs.
| Format | Works well for | Inputs to prepare |
|---|---|---|
| Project site | Several visitor questions and page destinations | Product details, documentation, contact route |
| Campaign page | One campaign and one primary action | Campaign message, approved links, action destination |
| Added site page | A new need within an existing site | Current site access, page location, matching assets |
Search engines decide whether and when to crawl, index and rank new pages. We can build clear structure and check agreed technical items. We cannot promise a search position. Product changes or third-party tools may also require work beyond the agreed build.
Send these 5 inputs to start the review
5 inputs give us enough to review the page format and identify open decisions. At DigitalMedia1, a delivery lead checks the visitor action, page list, available material and required integrations. Then you get a written plan.
Send us:
- Product summary: what the product does and its current stage.
- Visitor: who the site or page needs to help.
- Action: what visitors should do next.
- Current links: website, product, documentation and official channels.
- Build notes: required pages, integrations, brand assets and approval owner.
If a visitor flow needs a product interface rather than a marketing page, we can assess Web3 mobile app development. If the request stays within the site, we confirm the page list and content inputs. We also confirm the design review and final checks in writing.
The check log is a practical reason to start with us. It records each agreed page, link, form and responsive layout for review. Send the 5 inputs above with your target window. We reply within 1 working day. You get a written quote within 2 working days.
How it works
- 1. Send the product inputsShare the product summary, visitor, primary action, current links and available brand assets. Add any pages or integrations you already know you need.
- 2. Confirm the page planWe review the format, page list, content needs and approval owner. You get the agreed build items in writing before design starts.
- 3. Approve structure and designReview the page map and proposed layouts. Send consolidated feedback before development begins.
- 4. Build and checkWe build the approved pages and check the listed links, forms, layouts and interactions.
- 5. Review the handoffCompare the completed site with the agreed page plan. Receive the site and notes for the agreed handoff.
Frequently asked questions
What do we approve before development starts?
3 decisions should be clear first: the page list, primary visitor action and approved design. You also confirm which copy, links, forms and integrations belong in the build. We put those items in writing. You can check the plan before development starts.
Can one landing page cover a token launch and the product?
1 page can cover both when visitors need the same next action. Send the launch message and approved product facts. Include token details your team has approved. Add the destination for the main action. If visitors need separate product and launch routes, we can map distinct pages instead.
Which files and access should we prepare?
Prepare 5 inputs: a product summary, brand files and approved copy or source material. Add current site and documentation links. Include access for specified integrations. Send what you have first. We will mark missing items in the page plan. We will not assume product facts.
How do you check the site on mobile and desktop?
1 check log covers the agreed pages, responsive layouts, links, forms and specified interactions. We compare built pages with the approved design. We note issues for correction before handoff. Tell us which forms or external destinations matter when you send the initial requirements.
Can you add a wallet connection to the website?
1 wallet flow needs a separate technical review before it enters the site plan. Send the intended user steps and existing product documentation. Include any requirements your technical team has already set. We will confirm whether it fits the marketing site or needs a separate product build.
Will SEO setup secure a search position after launch?
Clear titles, page text and navigation give the site a readable search structure. Search engines decide whether and when to crawl, index and rank those pages. We cannot promise a position. Our check log covers the agreed build items, not decisions made by search engines.
Tell us about your project
Answer four quick questions and a manager will send you a plan, timing and a price range within the hour. Everything stays confidential.
Loading the form…